Vlaeynatie Office, Terneuzen, Netherlands

  • Gebäudeart:
  • Bürogebäude
Vollbild Schließen

Peikko Benelux has delivered DELTABEAM® Composite Beams , HPKM® Column Shoes, Anchor Bolts and the hidden corbel solution for the new office of ‘Vlaeynatie’ in Terneuzen. The contractor was very satisfied with the fast and easy construction method of the precast frame with the Peikko solutions. Long span guaranteed by DELTABEAM® generates flexible open spaces in the office.

Projektdaten

Tragwerksplaner:
Econstruct
Lieferzeitraum:
2015
Fertigstellung:
2016

Kontakt

Ton Rodenburg

Commercieel Technisch Adviseur

Tel. +31 (0)263843866
ton.rodenburg@peikko.com